Local SEO diagnostics

Find the one thing
holding your
rankings back.

Most SEO tools bury you in data. This one finds your weak spot, tells you what to fix, then proves the fix worked.

$20/mo FREE FOR 7 DAYS // NO CONTRACT
Diagnostic readout
Entity Presence7
Topical Authority8
Geographic Relevance3
Your constraint
Reputation5
Your lowest score is your bottleneck. Fix that first.
Why it works

We diagnose. We don't drown you in data.

Other tools hand you keyword research and competitor reports, then wish you luck. We scan your site and tell you exactly what to fix next.

01

Diagnose, not research

No keyword rabbit holes. We scan your site, find the gap, and tell you what content to build to close it.

02

One fix at a time

Every report names your weak spot and the exact work to do next. Do that. Then we point you at the next one.

03

Proof on paper

Reports are saved forever. See the baseline. Do the work. Watch next month's score climb. No spin.

The framework

The Local Optimization Matrix™

Google checks four things about your business. We score each one from 0 to 10. Your lowest score is the bottleneck. We fix that, then move to the next. One constraint at a time.

Entity Presence

Q.01

Who are you?

Google has to know you are a real, legit business. We check brand consistency, schema, outside mentions, and how clear your identity is.

  • 0–3Google is not sure you are real
  • 4–6Recognized but weak signals
  • 7–8Established entity
  • 9–10Strong, trusted brand
Low score fixAbout pages, organization schema, credentials, consistent name and address.

Topical Authority

Q.02

What do you know?

Google has to trust you know your field. We check keyword coverage, content depth, and how consistent your expertise reads.

  • 0–3Thin or unclear expertise
  • 4–6Some authority on some topics
  • 7–8Trusted in your niche
  • 9–10You own the topic
Low score fixFAQs, guides, how-to content, full service explanations.

Geographic Relevance

Q.03

Where do you matter?

Google has to believe you are trusted in a real place. We check your Google Business Profile, review quality, and service area coverage.

  • 0–3No local trust signals
  • 4–6Present locally but weak
  • 7–8Competitive in your market
  • 9–10Local market leader
Low score fixService plus city pages, local schema, real location content.

Reputation

Q.04

Why pick you?

Google has to see you can turn trust into action. We check review quality, case studies, pricing clarity, and conversion signals.

  • 0–3No reason to choose you
  • 4–6Some proof but weak
  • 7–8Credible and trusted
  • 9–10The obvious choice
Low score fixReviews, case studies, testimonials, clear pricing.

Content answers the question. Amplification makes Google hear it.

Amplification does not compete with the four scores. It multiplies them. Reviews lift Geographic Relevance and Reputation. PR and brand mentions lift Entity Presence. Brand searches lift everything.

Without it, your results hit a ceiling. With it, rankings pick up speed.

Worked example
Entity Presence
7
Topical Authority
8
Geographic Relevance
3
Reputation
5
Strategic focus // score 3

Fix Geographic Relevance. Skip the rest.

This business does not need blog posts or link building. It needs service plus city pages, local schema, and real local content. One priority. One constraint. Surgical focus.

See it in action

Real reports. Real fixes. Real proof.

Every report is a full snapshot of your SEO health, with an AI action plan for what to do next.

AI Driven SEO report dashboard showing performance metrics, keyword rankings, and AI strategic insights
01 Full performance overview with AI insights
AI Driven SEO project dashboard with multiple client reports and performance tracking
02 Project dashboard with KPI graphs
Six key SEO performance graphs showing rankings, traffic, and health metrics over time
03 Performance history over time
The Optimization Matrix chart showing Entity Presence, Topical Authority, Geographic Relevance, and Reputation scores
04 The Optimization Matrix scorecard
Local competitor map showing geographic distribution and competitive landscape
05 Local map and competitor view
On-page and technical SEO audit results with actionable recommendations
06 Technical health scan results
What you get

Everything you need. Nothing you won't use.

No bloated feature list. No research tools you will never open. Just the diagnostic tools that move the score.

Unlimited reports

Run as many as you want. Each one is a permanent record you can pull up anytime.

Keyword tracking

Watch positions, volume, and traffic value. See what moves and what needs work.

AI action plan

Every report says do this next. Clear priorities. Next month proves it worked.

Technical scanner

Finds crawl errors, broken links, duplicate content, and Core Web Vitals issues. Plus the fix.

Traffic analytics

Monthly visitors, traffic value, and page-level numbers. Know what is working.

Opportunity finder

We spot your gaps and tell you what content to build. No keyword research needed.

GBP checklist

122 steps for Google Business Profile, timestamped, each with an AI prompt idea.

WordPress plugin

Turns technical fixes into clean JSON you submit straight to your database. No code.

The difference

AI Driven SEO vs the big tools

Stop paying hundreds a month for features you never touch. Get the diagnostic essentials for $20.

Feature
AI Driven SEO
Traditional tools
Monthly cost
$20
$99–$999+
AI action plan
YES
NO
Clear next step
YES
NO
Permanent reports
YES
NO
WordPress fix plugin
YES
NO
GBP checklist with prompts
YES
NO
Keyword research tools
NO
YES
Competitor research tools
NO
YES

// We skip research tools on purpose. They are not the constraint. The fix is.

WordPress exclusive

The Fix Layer plugin

For WordPress sites: turn technical fixes into database updates. No coding. When the report finds an issue, the plugin builds clean JSON you submit straight to your site.

AUTO

JSON, generated for you

The plugin formats the fix from your report findings. Copy, review, submit, all inside WordPress.

SAFE

Reviewable and reversible

Check every fix before it runs. The plugin backs up your database first, so you can roll back.

FAST

Minutes, not hours

Schema, meta tags, canonicals, redirects. What took hours of database work now takes one click.

Included with every plan

The Fix Layer plugin comes free with your subscription. One-click download from your dashboard, clean WordPress integration, automatic updates.

Download the plugin ↓
Pricing

The tool every local business needs

No contracts. No hidden fees. Just the diagnostic power at a price that makes sense.

7-day free trial
Professional
$97 $20
PER MONTH AFTER TRIAL
  • Unlimited diagnostic reports
  • Real-time keyword tracking
  • AI action plan in every report
  • Technical health monitoring and fixes
  • Traffic analytics and value
  • Opportunity finder that tells you what to build
  • 122-step GBP checklist with AI prompts
  • Performance history tracking
  • Permanent reports for proof
Start your free trial →
7 days, no risk

Full access to everything. Run unlimited reports. See the constraint method work. Cancel anytime in the trial, no questions asked.

Need help doing the work?
Perfectly Optimized does the SEO for you. Bring them in anytime.